Quick Reference
Menu map, demo-data codes and statuses
Menu Map
| Group | Models |
|---|---|
| Organisation & People | Organisation, Council Site, Depot, Cost Centre, Person, Supplier, Attachment |
| Fleet & Asset Register | Asset Class, Asset, Asset Assignment, Meter Reading |
| Maintenance Planning | Maintenance Template (+Tasks), Asset Maintenance Plan |
| Inspections & Defects | Inspection Template (+Items), Asset Inspection, Inspection Response, Defect |
| Workshop & Work Orders | Work Request, Work Order, Work Order Task, Work Order Labour |
| Stores & Inventory | Store, Inventory Item, Store Stock, Inventory Transaction, Work Order Part |
| Purchasing | Purchase Requisition (+Lines), Purchase Order (+Lines), Goods Receipt (+Lines) |
| Fuel & Tyres | Fuel Facility, Fuel Transaction, Tyre, Tyre Fitment |
| Budget, Renewal & Incidents | Asset Incident, Budget, Renewal Assessment, Disposal |
Key Codes in the Demo Data
| Code | What it is |
|---|---|
GR-012 |
Cat 140 motor grader — 1000-hour service overdue (WO-2026-0412 scheduled) |
GT-045 |
Volvo FE garbage truck — AWAITING_PARTS on a hydraulic pump |
LV-101 |
Hilux ute — OUT_OF_SERVICE after an immediate-stop brake defect |
EX-030 |
Komatsu excavator — renewal assessment recommends REPLACE |
INSP-2026-0412 |
The pre-start that failed LV-101's brakes (photo attached) |
DEF-2026-0088 |
The IMMEDIATE_STOP brake defect it raised |
WR-2026-0201 / WO-2026-0410 |
EMERGENCY work request and in-progress brake repair |
HYD-PUMP-VFE |
The critical spare at zero stock (reorder point 1) |
REQ-2026-0310 / PO-2026-0771 |
Urgent requisition and the overdue purchase order |
TY-2025-118 |
Steer tyre scrapped early — sidewall cut from a kerb strike (INC-2026-0027) |
LV-088 / DSP-2026-0006 |
Camry sedan disposed at auction — sold $11,200, net $10,510 |
Status Vocabularies (the important ones)
Asset: PROPOSED → ORDERED → COMMISSIONING → AVAILABLE / ASSIGNED /
IN_SERVICE → UNDER_INSPECTION / UNDER_MAINTENANCE / OUT_OF_SERVICE /
DERATED / QUARANTINED / AWAITING_PARTS → AWAITING_DISPOSAL → DISPOSED /
WRITTEN_OFF
Work order: DRAFT → REQUESTED → ASSESSED → APPROVED → PLANNED →
SCHEDULED → RELEASED → IN_PROGRESS ⇄ (PAUSED | AWAITING_PARTS |
AWAITING_EXTERNAL_SERVICE) → WORK_COMPLETE → QUALITY_CHECK →
RETURNED_TO_SERVICE → CLOSED
Defect: OPEN → ASSESSED → (DEFERRED | WORK_ORDER_RAISED) → IN_PROGRESS
→ REPAIRED → VERIFIED → CLOSED — severity runs INFORMATION … CRITICAL ·
IMMEDIATE_STOP
Work priority: ROUTINE · PLANNED · PRIORITY · URGENT · EMERGENCY
Requisition: DRAFT → SUBMITTED → APPROVED → SOURCING → ORDERED →
PART_RECEIVED → COMPLETE
Purchase order: DRAFT → PENDING_APPROVAL → APPROVED → ISSUED →
ACKNOWLEDGED → PART_RECEIVED → RECEIVED → CLOSED
Tyre: IN_STOCK → FITTED → REMOVED_SERVICEABLE / REPAIR / SCRAPPED / LOST
Rules of Thumb
- A failed inspection item flagged
stop_use_on_fail⇒ IMMEDIATE_STOP defect, asset OUT_OF_SERVICE, EMERGENCY work request. - A service is "due" when next-due date passes or the meter comes within tolerance of next-due meter — whichever first.
- A work order can't leave QUALITY_CHECK for RETURNED_TO_SERVICE until its safety-critical tasks are verified; return to service flips the asset back to AVAILABLE and updates the maintenance plan's last-completed values.
- Stock available = on hand − reserved; at or below reorder point ⇒ replenishment (critical spares make it urgent).
- Deferring a defect needs a reason, a deferred-until date and an approver.
- (Phase 2) These rules are enforced by the rule engine described in the proforma — the data structures are all here today.